Made to measure timber frame structures for Houses, Extensions, Commercial construction and more

Final Load

After an exceptionally busy year, the final load for 2016 went to a site near Ambleside this morning.  At the time of writing we are still working on three different sites, all of which are scheduled to be finished within the next few days in time for them to be made watertight for the Christmas break.  2017 is also booking up fast!



Back to all posts ยป